We were given a green field and the brief was to turn it into a 3,000 square meter all-weather multi-use games area with combined car parking.

  • The level of the site needed to be reduced which required excavation works.
  • Following the excavation, we installed an attenuation system to conform to planning laws and comply with United Utilities legislation.
  • Over 1,800 cubic meters of spoil was removed before importing 2,000 tonnes of stone.
  • We installed 140 meters of linear drainage and 300 meters of concrete edgings.
  • We also installed 230 meters of specialist rebound sports fencing, as well as all the other surrounding fencing.
  • The job also involved the laying of 3000m2 of porous tarmac.