Longton Business Park
Preston, Lancashire
This project saw us completely replace the roadway around the business park and the adjoining car park. As part of this project we also needed to install drainage.
- We removed the existing old, stone surface of the card park and road.
- In place of the old surface we installed a new, tarmac surface.
- The installation required 120 tonnes of tarmac and covered a 750 square meter surface space.
- In addition to the new tarmac surface we also installed 70 metres of drainage piping.
Services used in this project include: